Short answer
Cost-plus pricing is the standard way to price a countertop job. You add up what the job costs you, then add a markup that covers overhead and a profit you can keep. On complex jobs, that can miss the value and the risk in the work. We built a value-based formula with different multipliers that works like a pricing calculator.
I'm Justin Shaw. I advise owners of countertop, stone, tile and flooring businesses at Driven For Growth.
A busy week can still leave you short on cash. The quote is often where that starts.
The common pricing mistakes
Two kitchens can have the same square footage and cost you very different amounts. One needs a second slab, a mitered edge, a farmhouse sink and a long drive. The other uses a remnant and a standard edge, five miles down the road.
If those two jobs go out at the same square-foot price, one of them may make you little or nothing.
Other mistakes I see:
- Building a quote from memory and missing edges, cutouts, travel or old-top removal.
- Treating markup and margin as the same thing.
- Covering only the slab and the hours, so overhead comes out of what you thought was profit.
- Coming down on price for a builder without changing the scope.
- Skipping the recap after the job ships, so the next quote repeats the same misses.
The standard way: cost-plus pricing
Cost-plus pricing is the standard approach. You add up what the job costs you, then add a markup to get the price.
Job cost
Job cost is what you spend to complete that one job: the material you actually buy, the labor to template, fabricate and install, and the extras that job needs.
I recommend you write down, for every quote:
- The slab you will buy. Customers see finished square feet. You buy slabs. Vein matching, seams and yield change how many slabs the job consumes.
- Templating, fabrication and install labor. Use the hours those steps really take, including travel.
- Edges, cutouts, splash and special work. These are easy to forget when a quote is built from memory.
- Travel, old-top removal and anything you subcontract.
Margin and markup
Markup is the amount you add on top of cost. Margin is the share of the selling price you keep.
Here is the math with made-up round numbers. They are for illustration only, so please do not copy them as your rate.
A job costs you $4,000. You add 40% and quote $5,600. The profit is $1,600. That is a 40% markup, and a 29% margin ($1,600 divided by $5,600).
To keep a 40% margin on the same $4,000 cost, the price is $4,000 divided by 0.60, which is about $6,667.
If you treat markup and margin as the same thing, the job looks fine on the quote and thin in the bank.
I will not give you a single target margin for a granite or quartz business. Businesses count cost differently. A number you copy from someone else can mislead you. The useful figure is your own margin on each job, and whether that price also covers overhead.
Cover overhead, then keep a profit
Rent, trucks, insurance, office pay and equipment costs do not show up on one kitchen. They still have to get paid.
If your price only covers the slab and the hours on that job, the overhead comes out of what you thought was profit.
I recommend a simple check from your own books:
- Add up last month's overhead.
- Divide it by the square feet you actually billed, or by the number of jobs you completed. Use the same unit each time.
- Look at whether last month's jobs covered that share and still left a profit.
Use your own books. The point is to see the gap, then fix the next quotes.
Review the job after it ships
A quote is a plan. The job is what really happened.
After the final payment, compare what you quoted with what you spent: slabs used, hours, extras, travel and remakes.
If the install ran long, or a second slab got used and never made it onto the invoice, the next quote should change.
A one-page recap on a small set of recent jobs will show you what to change. Start with the jobs that felt tight, or with five jobs of the same type.
When a builder wants a lower price
Builders and dealers often ask you to come down. That is part of the work.
Know the lowest price you can accept before that conversation starts, and put it on the price list you hand your salesperson. My post on how to hire a countertop salesperson and set their pay covers why I recommend paying commission on gross profit, so the rep has a reason to hold that line.
If you do move the price, change the scope or the extras so the job still earns its keep. A discount with the same edge, the same sink cutout and the same rush date comes straight out of your profit.
A lower price can be the right call on a repeat account you want to keep, once you know what the job costs.
Where cost-plus pricing falls short on complex jobs
Cost-plus pricing is a solid way to make sure the quote covers the job and leaves a profit.
On complex jobs, it can miss the value and the risk in the work. A remnant job for a repeat builder and a book-matched island with full layout approval are different promises. A rush date, hard access, or a higher level of layout control can change what the job is worth, and what it can cost you if it goes wrong.
A flat markup on cost treats those jobs as if the only difference is what you spend.
Our alternative: value-based pricing
At Driven For Growth, we built a value-based pricing approach for this.
It starts from the slabs you will actually buy, then uses a formula with different multipliers for value, risk, complexity, rush, travel and repeat work. It works like an actual pricing calculator for complex jobs.
I am not going to show the formula, the multipliers, or the worked numbers here. If you want to see how it works, start with the questions on this page, or email us at team@drivenforgrowth.co.
What to do this month
Pick three:
- Price your next five quotes with cost-plus pricing, including the slab you will actually buy.
- Write the lowest price a salesperson can quote without asking you.
- Recap the last five completed jobs against what you quoted.
- Add up last month's overhead and compare it with what those jobs left you.
- Separate owner pay from the profit the business keeps.
- Flag any complex job on the calendar that should be priced with a value-based approach.
Where this fits in our work
I advise countertop owners on pricing, quoting and the sales routine that protects margin, through Driven For Growth. You can read more on our countertop fabricator coaching page.
John at The Granite Shop saw $200K+ in new projects in 6 weeks while working with us. Foothills Granite built a $1M pipeline from a $100/mo B2B system.
The 90-Day Growth Engine is how I help owners get out of the day-to-day, including the quotes that still wait on them. A business that knows what each job earns is also easier to prepare for sale.
Justin Shaw, founder of Driven For Growth
FAQ
How should I price a countertop job?
The standard way is cost-plus pricing. You add up the job cost, then add a markup that covers overhead and a profit you can keep. For complex jobs, a value-based approach can also price for the value and the risk in the work.
What is cost-plus pricing for countertops?
Cost-plus pricing means you add up what the job costs you, then add a markup to get the price. Job cost includes the slab you will actually buy, fabrication and install labor, edges, cutouts, travel and anything you subcontract.
What is the difference between margin and markup on countertops?
Markup is the amount you add on top of cost. Margin is the share of the selling price you keep. Adding 40% to cost gives you a 40% markup, and a smaller margin.
What is a typical granite business profit margin?
I do not publish a single number, because businesses count cost differently. The useful figure is your own margin on each job, and whether that price also covers overhead.
Should I use a price per square foot for countertops?
A square-foot number can be a starting point. Two kitchens with the same area can cost you very different amounts, so price from the job in front of you.
How do I protect margin when a builder wants a lower price?
Know the lowest price you can accept before the conversation. If you move, change the scope or the extras so the job still earns its keep.
How should I price a complex countertop job?
Cost-plus pricing still starts from job cost. On complex jobs, it can miss the value and the risk in the work. We built a value-based formula with different multipliers for value, risk, complexity, rush, travel and repeat work, so it works like a pricing calculator. Email us at [email protected] if you want to see it.